Structural steel frame for a regional distribution center

We fabricated and delivered 420 tonnes of structural steel beams and columns, then erected them on site two weeks ahead of schedule. Every weld was inspected and documented to ISO 9001 standards.

Client:

Globera Inc

Duration:

10 weeks

Category:

Construction, Steel

Engineer in a hard hat and a manager reviewing a design on a computer screen in a factory.

Overview

A new distribution center needed strong steel on a fixed schedule.

Northline Logistics was building a regional distribution center with 12 loading bays and high-rack storage. They needed structural steel that could carry the roof, the platforms and heavy equipment, and the building had to open before the busy season. We took on the engineering, the fabrication and the installation as one package.

The client asked for a high load rating, a durable finish and a delivery plan that matched their building schedule. Parts had to arrive in the order they would be installed, so the site team could work without waiting.

Our Strategy

We built the steel in sections that are quick to install on site.

Our engineers divided the structure into sections that could be fabricated in the workshop and bolted together on site. Each section was marked and packed in installation order, which cut site work and reduced the need for cranes. Standard profiles were used wherever the design allowed, saving about 2 weeks of lead time.

We measured each section against the drawings and checked every weld before the finish was applied. The steel was hot-dip galvanised to resist moisture and wear. The client received a written inspection report with each delivery.

Worker in protective gloves operating a yellow crane pendant control on the factory floor.
Manager and worker in hard hats walking through a warehouse aisle of metal parts.

The Results

The client received the full structure on time and within budget.

The steel was installed in 5 weeks, and the distribution center opened on the agreed date. The sectional design reduced time on site, and the galvanised finish needs little upkeep. The client has asked us to quote a second building at another location.

Parts had to arrive in the order they would be installed, so the site team could work without waiting. We reviewed the drawings with their engineers and agreed the scope and the dates in the first 2 weeks.

0%

Parts inspected before shipping

Every part is measured and checked against your drawings, and you receive a written inspection report with each delivery.

0%

Parts inspected before shipping

Every part is measured and checked against your drawings, and you receive a written inspection report with each delivery.

0%

Orders delivered on time

We plan each order around real workshop capacity and material lead times, so we deliver on the date we agreed.

0%

Orders delivered on time

We plan each order around real workshop capacity and material lead times, so we deliver on the date we agreed.

0%

Waste recycled

Send your drawings or project details, and our team replies with a quote and an estimated timeline within 2 business days.

0%

Waste recycled

Send your drawings or project details, and our team replies with a quote and an estimated timeline within 2 business days.

We came to Fabricus with a tight deadline and a building that had to open before the season. From the first call, the engineers went through our drawings line by line and suggested a few small changes that saved about 2 weeks of lead time. Every section arrived marked and packed in the order we needed it, so our site team never had to wait or guess.

Headshot of a client in a grey headscarf and navy blazer.

Elena Rostova

Globera Inc

We came to Fabricus with a tight deadline and a building that had to open before the season. From the first call, the engineers went through our drawings line by line and suggested a few small changes that saved about 2 weeks of lead time. Every section arrived marked and packed in the order we needed it, so our site team never had to wait or guess.

Headshot of a client in a grey headscarf and navy blazer.

Elena Rostova

Globera Inc

Subscribe to our newsletter

Join our email list for news about our work and the industries we serve. You will also hear first about new services and projects.

Your information is kept confidential

You might also like

You might also like

You might also like

|

|

|

Tell us what you need built, and our engineers will review your drawings and requirements. We will help you define the scope, confirm the materials and agree a clear schedule. You get a written quote within 2 business days.

Gloved worker guiding a yellow robotic welding arm as sparks fly.

Create a free website with Framer, the website builder loved by startups, designers and agencies.