Conveyor and assembly line for a packaging plant

We designed, fabricated and assembled a 180-metre conveyor system and tested it as a complete unit before shipping. The client installed it in 5 days with no on-site adjustments.

Client:

Billions Inc

Duration:

10 weeks

Category:

Assembly, Automation

Food technician in a hairnet inspecting a bottle of cooking oil on a production line.

Overview

A packaging plant needed a faster line that fit its existing hall.

Vandermeer Packaging was packing more orders than its manual lines could handle and wanted one connected conveyor and assembly line. The new line had to run through 5 stations, from sorting to final packing, within the floor space the plant already had. We took on the engineering, the fabrication and the installation as one package.

The client had tried to extend the old lines in stages, and each stage added a new supplier and a new delay. Placing the whole line with one workshop gave them a single design, a single schedule and one team to call.

Our Strategy

We built the line in modules that connect quickly on site.

Our engineers divided the line into modules, each with its own steel supports, guards and stations. Every module was built, tested and finished in the workshop, so only the connection work remained on site. Adjustable feet let the team level the line on the existing floor without drilling new foundations.

We used stainless steel for the sections near the packing stations and carbon steel with a painted finish for the supports. The edges of every guard were rounded and the walkways had non-slip surfaces, which made the line safer for the operators.

Bottles of cooking oil moving along a filling line.
Senior technician in a hairnet checking bottles of cooking oil on a conveyor.

The Results

The plant packs more orders each shift with the new line.

The modules were installed over 4 weekends, so the plant lost no packing shifts. The line was running on the agreed date, and the operators were trained on it within a week.

The plant now packs about 35% more orders each shift, and the smoother flow has reduced jams at the stations. The client has asked us to quote an extension that adds 2 more stations next year.

0%

Parts inspected before shipping

Every part is measured and checked against your drawings, and you receive a written inspection report with each delivery.

0%

Parts inspected before shipping

Every part is measured and checked against your drawings, and you receive a written inspection report with each delivery.

0%

Orders delivered on time

We plan each order around real workshop capacity and material lead times, so we deliver on the date we agreed.

0%

Orders delivered on time

We plan each order around real workshop capacity and material lead times, so we deliver on the date we agreed.

0%

Waste recycled

Send your drawings or project details, and our team replies with a quote and an estimated timeline within 2 business days.

0%

Waste recycled

Send your drawings or project details, and our team replies with a quote and an estimated timeline within 2 business days.

We needed one connected line that would fit our existing hall, and we could not afford to stop packing orders while it went in. Fabricus's engineers spent the first 2 weeks walking through our hall and our shift pattern, and they wrote down every work window and every document we would need. Each module was built and tested under load in their workshop, so the installation over 4 weekends was only a matter of connecting the sections.

Headshot of a client with a grey beard in a navy blazer and white shirt.

Julian Mercer

Billions Inc

We needed one connected line that would fit our existing hall, and we could not afford to stop packing orders while it went in. Fabricus's engineers spent the first 2 weeks walking through our hall and our shift pattern, and they wrote down every work window and every document we would need. Each module was built and tested under load in their workshop, so the installation over 4 weekends was only a matter of connecting the sections.

Headshot of a client with a grey beard in a navy blazer and white shirt.

Julian Mercer

Billions Inc

Subscribe to our newsletter

Join our email list for news about our work and the industries we serve. You will also hear first about new services and projects.

Your information is kept confidential

You might also like

You might also like

You might also like

|

|

|

Tell us what you need built, and our engineers will review your drawings and requirements. We will help you define the scope, confirm the materials and agree a clear schedule. You get a written quote within 2 business days.