Pressure vessel fabrication for a chemical processing facility

Our certified welders built 12 stainless steel pressure vessels to client specification, each pressure tested and delivered with full material traceability.

Client:

Zaffiro Inc

Duration:

10 weeks

Category:

Fabrication, Steel

Valve on yellow gas pipework with a worker in a hard hat in the background.

Overview

A chemical facility needed safe, certified vessels on a fixed schedule.

Alder Chemical Works was expanding a production line and needed 4 pressure vessels to hold process liquids at high internal pressure. The vessels had to resist corrosion, stay leak-free and arrive in time for the line to start up. We took on the engineering, welding, testing and the delivery as one package.

The client had worked with 3 different suppliers on earlier projects, and each part of the job had its own contact and its own schedule. Placing the whole scope with one workshop gave them a single point of contact and a single delivery date, which made their own planning much simpler.

Our Strategy

We chose stainless steel and qualified welders for every joint.

Our engineers selected 316L stainless steel, which resists many chemicals and keeps its strength under pressure. Before production started, we agreed the wall thickness, the nozzle positions and the weld details with the client, and we approved a weld procedure for each type of joint.

Only welders qualified for pressure work were assigned to the vessels. The design included access points for cleaning and inspection, which reduces upkeep for the client, and we added lifting points so the vessels could be moved safely into position on site.

Smiling technician in a hard hat working on equipment between yellow tanks.
Worker in a hard hat and ear defenders turning a valve wheel on blue pipework.

The Results

The client received 4 tested vessels on time and ready to install.

All 4 vessels passed their pressure tests the first time and arrived on the agreed date. The client's team installed them in 3 days, and their safety review accepted the documents without questions.

The production line started on schedule, and the vessels have run without leaks since installation. The client has asked us to quote 2 more vessels for the next phase and to review their older equipment for repair.

0%

Parts inspected before shipping

Every part is measured and checked against your drawings, and you receive a written inspection report with each delivery.

0%

Parts inspected before shipping

Every part is measured and checked against your drawings, and you receive a written inspection report with each delivery.

0%

Orders delivered on time

We plan each order around real workshop capacity and material lead times, so we deliver on the date we agreed.

0%

Orders delivered on time

We plan each order around real workshop capacity and material lead times, so we deliver on the date we agreed.

0%

Waste recycled

Send your drawings or project details, and our team replies with a quote and an estimated timeline within 2 business days.

0%

Waste recycled

Send your drawings or project details, and our team replies with a quote and an estimated timeline within 2 business days.

We needed 4 pressure vessels for a production line that could not start late, and we had been let down on schedule by other suppliers before. Fabricus's engineers went through our specification in the first 2 weeks and wrote down every standard, every date and every document we would need. When we asked for a change to the nozzle positions, they told us the same day what it would do to the cost and the schedule, and they kept to the date.

Headshot of a client in a dark suit and white shirt.

David Cho

Zaffiro Inc

We needed 4 pressure vessels for a production line that could not start late, and we had been let down on schedule by other suppliers before. Fabricus's engineers went through our specification in the first 2 weeks and wrote down every standard, every date and every document we would need. When we asked for a change to the nozzle positions, they told us the same day what it would do to the cost and the schedule, and they kept to the date.

Headshot of a client in a dark suit and white shirt.

David Cho

Zaffiro Inc

Subscribe to our newsletter

Join our email list for news about our work and the industries we serve. You will also hear first about new services and projects.

Your information is kept confidential

You might also like

You might also like

You might also like

|

|

|

Tell us what you need built, and our engineers will review your drawings and requirements. We will help you define the scope, confirm the materials and agree a clear schedule. You get a written quote within 2 business days.

Gloved worker guiding a yellow robotic welding arm as sparks fly.

Create a free website with Framer, the website builder loved by startups, designers and agencies.