Custom engineered structures for a rail maintenance depot

Our engineers reviewed the client's drawings, proposed a lighter design that cut material use by 18%, and then produced and installed 96 support structures.

Client:

Verdure Inc

Duration:

10 weeks

Category:

Rail, Fabrication

Engineer in a hard hat and safety glasses adjusting a sensor on a yellow industrial robot arm.

Overview

A rail depot needed custom steel structures built around working tracks.

Keystone Rail Services was upgrading a maintenance depot that services passenger trains, and it needed new structures to reach the roofs, sides and undersides of the vehicles safely. The scope covered inspection platforms along 3 tracks, a support structure for an overhead crane and linked walkways. We took on the engineering, the fabrication and the installation as one package.

No two tracks in the depot had the same layout, so standard catalogue products did not fit. Placing the whole scope with one workshop gave the client a single design for all 3 bays and a single schedule for the work.

Our Strategy

We designed each structure for its own track and built it in sections.

Our engineers surveyed the depot and designed each platform for the vehicles that use that track. Every structure was divided into sections that could be fabricated, finished and checked in the workshop, then bolted together on site within a single work window.

The platforms have adjustable gates that fold away when not in use, and the walkways have non-slip surfaces and handrails on both sides. The crane support was designed with extra strength reserve, so the client can add heavier lifting equipment later without changing the structure.

Two women in hard hats, one holding a tablet, discussing work on a factory floor.
Engineer in a hard hat programming a yellow industrial robot with a handheld pendant.

The Results

The depot works faster and more safely on all 3 tracks.

All structures were installed on the agreed dates, and no track was closed for longer than its planned window. The crane support passed its load test the first time, and the client's team started using it the following week.

Maintenance crews now reach the roof and sides of the trains from a platform instead of ladders, and the average time for a routine inspection has dropped by about 25%. The client has asked us to quote the same structures for a second depot.

0%

Parts inspected before shipping

Every part is measured and checked against your drawings, and you receive a written inspection report with each delivery.

0%

Parts inspected before shipping

Every part is measured and checked against your drawings, and you receive a written inspection report with each delivery.

0%

Orders delivered on time

We plan each order around real workshop capacity and material lead times, so we deliver on the date we agreed.

0%

Orders delivered on time

We plan each order around real workshop capacity and material lead times, so we deliver on the date we agreed.

0%

Waste recycled

Send your drawings or project details, and our team replies with a quote and an estimated timeline within 2 business days.

0%

Waste recycled

Send your drawings or project details, and our team replies with a quote and an estimated timeline within 2 business days.

Our depot services trains on a fixed cycle, and every track we close costs us money, so we needed structures that were built to fit and installed fast. Fabricus's engineers surveyed all 3 tracks in the first 2 weeks and designed each platform for the trains that use it. Every section arrived marked and finished, and each installation took place inside the work window we agreed, with no track closed for longer than planned.

Headshot of a client in a grey headscarf and navy blazer.

Sarah Jenkins

Verdure Inc

Our depot services trains on a fixed cycle, and every track we close costs us money, so we needed structures that were built to fit and installed fast. Fabricus's engineers surveyed all 3 tracks in the first 2 weeks and designed each platform for the trains that use it. Every section arrived marked and finished, and each installation took place inside the work window we agreed, with no track closed for longer than planned.

Headshot of a client in a grey headscarf and navy blazer.

Sarah Jenkins

Verdure Inc

Subscribe to our newsletter

Join our email list for news about our work and the industries we serve. You will also hear first about new services and projects.

Your information is kept confidential

You might also like

You might also like

You might also like

|

|

|

Tell us what you need built, and our engineers will review your drawings and requirements. We will help you define the scope, confirm the materials and agree a clear schedule. You get a written quote within 2 business days.

Gloved worker guiding a yellow robotic welding arm as sparks fly.

Create a free website with Framer, the website builder loved by startups, designers and agencies.