Before planning starts, we confirm exactly what is included: the parts, the quantities, the materials, the finish and the documents. Every item is written down and shared with you, so both sides work from the same list.
Our engineers check your drawings for details that are hard to weld, slow to build or expensive to finish. They suggest small changes, such as using a standard section, that can shorten the schedule without changing how the part works.
The number of parts you need changes the price per part.
Tell us how many parts you need now and whether you expect to reorder. A larger run lowers the cost of each part, because setup time and material are shared across the whole order.
Include the key dimensions and weights for each part if they are not on your drawings. If you are comparing quantities, ask us to quote 2 or 3 options side by side, so you can see where the price per part drops.
Naming the material and finish upfront avoids price changes later.
Say which material you want, such as structural steel, stainless steel or aluminium, and which finish you need, such as painting, galvanising or powder coating. These choices have a large effect on both the price and the lead time.
If you are not sure, describe where the part will be used and what conditions it will face. We will recommend a material and finish that fit your budget, and we can price an alternative so you can compare.
Tell us which standards apply so the quote includes the right checks.
List any standards, certificates or inspection reports your project requires, such as material certificates or welding to a named standard. These add testing and paperwork, so they need to be in the price from the start.
If your client or site has its own quality rules, send them with your request. This avoids delays at delivery, when a missing document can hold up acceptance of the parts.
Your target date lets us plan the schedule and confirm what is possible.
Share the date you need the parts, and tell us where to deliver them. We will check the workshop schedule and the lead time on materials, and tell you whether the date is realistic.
If your date is flexible, say so. Allowing a few extra days can lower the cost, and it gives us room to use standard sizes that arrive sooner. Send everything through the quote form, and we will reply within 2 business days.